Lasco Project #5, Palais de Tokyo (curated by Hugo Vitrani), May 2016: he intervened on the concrete lower levels of the palace and, with VINCI Highways, on a stretch of the A86 Duplex motorway tunnel (the 'concrete cathedral', Rueil-Malmaison–Vélizy), opened to the public on 22 May 2016. One of his most significant works on the institutional front.
concrete space painted in full · which of the two spaces, to be verifiedsource: felipepantone.com (studio archive) · murals-photos-manifest.md / site-images-manifest.mdPRAESENTIA (2020) · PDF 46 · the A86 Duplex tunnel, the «catedral de hormigón»source: clearance: local prototype · plates-manifest.mdphoto from the studio Drive (harvest 2026-07-04) · folder paris-2016-palais-de-tokyosource: Studio Drive — FPSTUDIO archive · harvest 2026-07-04photo from the studio Drive (harvest 2026-07-04) · folder paris-2016-palais-de-tokyosource: Studio Drive — FPSTUDIO archive · harvest 2026-07-04photo from the studio Drive (harvest 2026-07-04) · folder paris-2016-palais-de-tokyosource: Studio Drive — FPSTUDIO archive · harvest 2026-07-04photo from the studio Drive (harvest 2026-07-04) · folder paris-2016-palais-de-tokyosource: Studio Drive — FPSTUDIO archive · harvest 2026-07-04